The City publishes every permit, including who won every past award. So we know which general contractors spread work around and which ones have used the same sub for the last twenty jobs. You get the open scopes ranked by whether you can realistically take them, with the reason attached, and the ones you would be wasting a bid on taken out before you ever see them.
What reads the permit file at six in the morning, what it throws out before you ever see it, and what is in your inbox when you get to the truck.
Every award in Austin is public, so we can see exactly how each general contractor behaves. Across the commercial mechanical awards on record:
On top of that we check your own history. If you have won work from a GC before, that job goes to the top of your list and we say why, so whoever makes the call opens with it.
A real Austin mechanical contractor, 178 open scopes in their zip codes:
That is the difference between a list and a plan. Anyone can scrape 477 addresses. Knowing which 91 to call first is the part that wins work.
Calling 477 general contractors is. That is the part we actually built.
Every morning. Finds the commercial jobs in your zip codes where your scope is still open, and discards solar, signage, paving, foundation repair and event permits.
Against every past award that GC has made and your own history with them. The unwinnable ones never reach your list.
As your company. Asks whether the scope is still open, who is bidding it, and books the walkthrough straight onto your calendar.
Calls, texts, calls again, on a schedule, for as long as it takes. Nobody in your office has to remember to.
Submittals, schedule, change orders, closeout. You see the whole board without chasing a project manager for an update.
The week the job finishes, which is the one moment the GC is happiest to give you one. Not six months later.
Invoice out, reminders on a ladder, escalation when it ages. Commercial pays net 60 and nobody chases it. This does.
Measured across a year of Austin permits, the median gap between a commercial building permit being issued and the trade scope being awarded is 24 days. That is the whole window. Seeing the job on day two instead of hearing about it on day twenty is the entire difference.
If you run residential service work instead, the AI Growth System is the page you want.
We will send you this week's list for your trade and your zip codes, free, with the GC's phone on every job.
Get this week's open scopes →